Jump to content

Dyneema forestay for Javelin


Recommended Posts

I need to shorten my forestay on the Javelin. It is currently 5mm SS so I will have to take it to a rigging place (mast and all) to get it done which is a bit of a pain.

Would Dyneema work if I oversized it heaps? I can get Dynice Dux locally which, if I use say 7mm will give me a breaking load of 7.5T. I figure that the load in the stay should be well less than 750kg (10% of MBL) so as long as I prestretch my splices it shouldn't creep or stretch on the boat.

 

Am I on the right track or just risking a word of pain and frustration?

Link to post
Share on other sites

It creeps.  You will forever be chasing rig tension changing.  
 

at 7mm the weight windage will probably worse than 3mm wire


We use 4mm  on the prod of a 12.   Prestressed splices to 2t overnight to bed them in.

   It will needs  a winch to put it in in the morning, and will be getting soft by the end of the day.  Fine for a prod, hopeless for a tensioned rig

3mm 1x19  wire is all you need for a forestry

the skiffs and sports boats not running wire  are running either pbo or 2.5/ 3mm solid carbon rod.

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...