Priscilla II 392 Posted April 2, 2019 Share Posted April 2, 2019 https://www.stuff.co.nz/auckland/111753123/new-bridge-planned-for-aucklands-wynyard-quarter https://www.youtube.com/watch?v=epydPvBEXSo Quote Link to post Share on other sites
ex Elly 197 Posted April 3, 2019 Share Posted April 3, 2019 Replacement footbridge to be built next year in time for America's club. Looks like it is a twisting or rotating type rather than a lifting bridge. Quote Link to post Share on other sites
Fish 0 Posted April 3, 2019 Share Posted April 3, 2019 I thought Auckland Council had issues with hitting the credit limit, and was working to reduce unnecessary expenses? Or am I mixed up and they are just trying to screw everyone they can for more revenue / rates / levies / user pays charges, and still go around pissing it all up against a wall as fast as they can? Quote Link to post Share on other sites
Priscilla II 392 Posted April 3, 2019 Author Share Posted April 3, 2019 No mention of cost suprise suprise. Existing one was temporary is worn and requires maintenance. New one reminiscent of big birds wings. Quote Link to post Share on other sites
cj! 19 Posted April 3, 2019 Share Posted April 3, 2019 I had heard the same, that the current temporary bridge is due for replacement due to operating/maintenance costs and that they'll be building a temporary pontoon bridge in the interim. Quote Link to post Share on other sites
Crazyhorse 47 Posted April 3, 2019 Share Posted April 3, 2019 Isn't there a spare bridge in a west coast river? Quote Link to post Share on other sites
Fish 0 Posted April 3, 2019 Share Posted April 3, 2019 Isn't there a spare bridge in a west coast river? Thats the joke of it, I'll be you a good bottle of premium hooch that this Wero bridge, designed for pedestrians only, will cost substantially more than replacing a key state highway bridge down south. The one down south enables revenue to be generated from a prime export industry (inbound tourism) for a region sorely lacking in other revenue sources, the Wero bridge, well, I'm not sure what is for really, I think people can get from car parks to the pubs at the Viaduct a tad quicker. Quote Link to post Share on other sites
muzled 140 Posted April 3, 2019 Share Posted April 3, 2019 Estimate is $25.7M, so could end up being $30M-$40M? Just lucky we're upto our balls in surplus cash I guess... https://www.greaterauckland.org.nz/2019/04/04/new-wynyard-crossing-bridge/#comment-298992 Quote Link to post Share on other sites
Priscilla II 392 Posted April 3, 2019 Author Share Posted April 3, 2019 This is the sort of bridge required. One that can be multi purposed as the Western Reclamation gets fully developed. Not something inspired by this sculpture after a leisurely long lunch. Quote Link to post Share on other sites
Crazyhorse 47 Posted April 4, 2019 Share Posted April 4, 2019 Thats the joke of it, I'll be you a good bottle of premium hooch that this Wero bridge, designed for pedestrians only, will cost substantially more than replacing a key state highway bridge down south. The one down south enables revenue to be generated from a prime export industry (inbound tourism) for a region sorely lacking in other revenue sources, the Wero bridge, well, I'm not sure what is for really, I think people can get from car parks to the pubs at the Viaduct a tad quicker. Someone mentioned HHHHHOOOOCH!!? Quote Link to post Share on other sites
muzled 140 Posted July 1, 2019 Share Posted July 1, 2019 (in your best colonel Klink voice) HALT! https://www.panuku.co.nz/news-and-blogs/pushing-pause-on-wynyard-crossing “There are a number of challenges with the replacement of the Wynyard Crossing bridge. The most significant is our ability to complete the connection by the time the America’s Cup starts,” said Panuku’s Development Director, Allan Young. “It may feel like we’re pushing pause on progress, but we want to ensure that what is built is going to be of the highest quality and design innovation. We want to make a positive and memorable contribution to Auckland’s city centre and waterfront by giving Aucklanders something they can be proud of,” said Young. By pushing pause now and continuing to progress the project while the resource consent application is being processed, we’re going to be in a much stronger position to hit fast forward again once the America’s Cup and APEC have finished. Quote Link to post Share on other sites
Dtwo 157 Posted July 1, 2019 Share Posted July 1, 2019 Does that photo mean that those things rotate? If so, I can just imagine someone being a bit toooo close and getting the rig caught. Or, being as it is likely designed by someone that doesn't inhabit this mortal plane, trying to open in a rip-snorter NE - and failing/falling/being too unsafe to walk on..... Panuku - bringing the city down. Quote Link to post Share on other sites
waikiore 398 Posted July 3, 2019 Share Posted July 3, 2019 Correct, another Panuku cock up, taking from the poor Westhaven boaties and funding this sort of nonsense designed by someone without practical waterfront experience, of course it is now on the backburner even though was promised to be 90% built off site . I believe they may have had trouble getting someone to operate the temp crossing whilst this was being installed... Quote Link to post Share on other sites
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.