Myjane 40 Posted August 28, 2019 Share Posted August 28, 2019 Need some more brains please I am solid blocking between deck beams to re seal the Genoa tracks back in place on good timber decks , I see under the track 32 mill there isn’t much bearing face on the deck , being the rebated std track so I was thinking of a 32x3 mill alloy strap central under and sealed to the deck first full length then the track on top bolted through , I know timber is an option as a packer but thought alloy would be better Quote Link to post Share on other sites
Island Time 1,286 Posted August 28, 2019 Share Posted August 28, 2019 Pic? If the track is completely in contact with the base material, timber is fine. Quote Link to post Share on other sites
Myjane 40 Posted August 28, 2019 Author Share Posted August 28, 2019 Yes it would be siting on the base material wich would be full sealed to the deck reason is the under side of these tracks has two 5 mill wide areas to touch the deck an room for seal in the middle So was trying to make it better , thanks for you thoughts Quote Link to post Share on other sites
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.