Jump to content

Ghetto vacuum bagging


Recommended Posts

Needs must 2 days before Christmas.

Making a plinth for the skipper so she can see over the dodger.  6mm ply either side of some expol underfloor insulation.  It will be inside a canvas cover with handles on it so it can double as a rescue float aid.

Merry Christmas crew.

IMG_20231223_134430.jpg

  • Haha 1
  • Upvote 1
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...