Jump to content

Pile mooring


banaari

Recommended Posts

OK folks; setting up a pile mooring.

 

I know the lengths involved, and how I plan to configure pick-up lines.

What I don't know:

 

(a) What actual rope do you use? (We're tying up a 6.5 metre Beachcomber, not the QM2)

(B) What fittings?

© One end is a floating ring; the other is a piece of railway line. How best to fasten to, with what, and how?

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...