banaari 27 Posted November 26, 2012 Share Posted November 26, 2012 OK folks; setting up a pile mooring. I know the lengths involved, and how I plan to configure pick-up lines. What I don't know: (a) What actual rope do you use? (We're tying up a 6.5 metre Beachcomber, not the QM2) ( What fittings? © One end is a floating ring; the other is a piece of railway line. How best to fasten to, with what, and how? Link to post Share on other sites
wheels 543 Posted November 26, 2012 Share Posted November 26, 2012 PM KM Link to post Share on other sites
banaari 27 Posted November 27, 2012 Author Share Posted November 27, 2012 PM KM PM'd KM. KM PM'd back. VG !! Link to post Share on other sites
Recommended Posts
Archived
This topic is now archived and is closed to further replies.