Productive (3 day) weekend...
1)Installed a 30L Quick Hot water system, works a treat, nice to have hot water on tap and a warm fresh water wash at the end of the day.
2) Removed the stbd genoa track cleaned and primed the deck then replaced the track on a series of Micarta/Tufnell pads all well sealed on Butyl/mastic tape with large washers beneath the deck to spread the load. The gaps in the packers allows the water to drain through... all in all, a good watertight outcome. The fasteners inside the back of the galley cupboards were a challenge to get at. Next 3 tracks are easy to a