Jump to content

Building a jetty in Marlborough Sounds - the process?


Recommended Posts

Hi all, I’m hoping to build a jetty with a gangway to a floating pontoon, held in place by mooring blocks, during this year. Has anyone had much experience with this process? Specifically, how is the Marlborough District Council on these structures? And do I need to engage an engineer directly or does my builder do that for me? Any advice and feedback gratefully accepted. Thanks.

Link to post
Share on other sites

this took 3 seconds to google...

https://www.marlborough.govt.nz/repository/libraries/id:1w1mps0ir17q9sgxanf9/hierarchy/Documents/Services/BC/BC Appn Checklist Master/BAC0002_3_PIM_BC_Appln_Checklist_Jetties_with_Boatsheds.pdf

I'm picking you will need resource consent and that probably means an environmental impact report, engineering report and detailed information about the intended use of the jetty.  Given the number of these structures in the Sounds, I also suspect there will be several local firms who specialise in them and have all that info at their fingertips.

These guys for example: https://piertwo.co.nz/

  • Like 1
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...